Multi-purpose children center « CPE 1&2 »
Paul Wurth Geprolux was in charge of implementing a new concept of security. Typically, buildings are designed to carry only general requirements concerning the security of the children and the consumption of energy. The renovation work in the building was executed with a particular logistics plan to protect the young children from the potential dangers of the construction site.
Key figures
Built volume
7.500 m3
Built surface
2.300 m2
Project duration
2008 – ongoing
Construction period
2009 – ongoing
Our missions
- Project scope
- Project preparation
- Project management
- Green building design
- Preliminary design
- Permitting
- Execution design
- Contract management
- Construction site management
- Works coordination
- Commissioning
Design team
General planner
Paul Wurth Geprolux
A new project?