The scholar building, proposing 18 classrooms for approximately 400 students, should have been built in record time of only 12 months according to the needs of the Sportlycée.

The constructive concept (mix steel + concrete) is based on some main criteria :

1.efficient building regarding energy consumption and sustainability, and

2.construction costs optimization and quickness of execution

The energy concept follows the recommendations of the office Basler + Partner.

Key figures

Built volume

17.500 m3

Built surface

5.300 m2

Project duration

(14 months) 2011 - 2012

Construction period

(10 months) 2011 - 2012

Our missions

  • Project Management
  • Execution design
  • General contractor
  • Coordination and construction management
  • Quality control and conformity of the works