ISL REFIT
The scope of the works was determined in close collaboration with the customer to fit his needs and the cost were estimated. After confirmation of the budget the transformation works were designed in detail: extension of kitchen and cafeteria, transformation of classrooms in music rooms with special acoustic requirements, extension of library, etc. The very short time frame for execution– works only during holidays- was respected, example: works for about 3 Mio € in 8 weeks in summer 2013.
Key figures
Surface
~3.800 m2
Project duration
2011 – 2014
Our missions
- Project scope
- overall Design
- Project management
- Permitting
- Budget management/Controlling
- Contract management
- Construction site management
- Commissioning
Our services
Design team
General planner
Paul Wurth Geprolux