FAGE – new dairy
The construction of the new dairy for the yoghurt maker FAGE International S.A. takes place over 2 phases, with a target of a production of 80,000 tons of yoghurt per year and the creation of 200 new full-time jobs. The site includes the main plant, the administrative building and a separate combined wastewater and biogas plant.
The mission of Paul Wurth Geprolux consists mainly in the coordination of the General planner’s team and of the technical engineering.
Key figures
Construction cost (excl. VAT)
Confidential
Gross surface
41.200 m2
Project duration
2016 - 2020
Our missions
- General planner
- Technical Engineering
- Internal coordination of the General planner’s team
- APS/APD/Submission Documents
- Control of the documentation and execution plans of the General Contractor
- Monitoring of the quality of work
Design team
Architect
ARCO Architecture Company
Civil engineer
Schroeder & Associés
Technical engineer
Paul Wurth Geprolux.
A new project?