FAGE – new dairy

Building owner

FAGE International S.A.

Location

Luxembourg

The construction of the new dairy for the yoghurt maker FAGE International S.A. takes place over 2 phases, with a target of a production of 80,000 tons of yoghurt per year and the creation of 200 new full-time jobs. The site includes the main plant, the administrative building and a separate combined wastewater and biogas plant.

The mission of Paul Wurth Geprolux consists mainly in the coordination of the General planner’s team and of the technical engineering.

Key figures

Construction cost (excl. VAT)

Confidential

Gross surface

41.200 m2

Project duration

2016 - 2020

Our missions

  • General planner
  • Technical Engineering
  • Internal coordination of the General planner’s team
  • APS/APD/Submission Documents
  • Control of the documentation and execution plans of the General Contractor
  • Monitoring of the quality of work

Design team

Architect

ARCO Architecture Company

Civil engineer

Schroeder & Associés

Technical engineer

Paul Wurth Geprolux.