European Court of Auditors – building
Building owner
European Court of Auditors: Office for Infrastructure and Logistics (OIL)
Location
Luxembourg
The overall project objective is to update the building infrastructure to contemporary standards and best practices with respect to safety, environment and security. In this phase, the revitalisation focused on Heating-Ventilation-Air Conditioning (« HVAC »). Thus, Paul Wurth Geprolux has programmed the replacement of the aeration system, the air-conditioning and heating of the building, while maintaining normal building operations throughout the completion of the work.
Key figures
Built volume
~ 80.000 m3
Built surface
~ 24.000 m2
Project duration
2005 – 2009
Construction period
2007 – 2009
Our missions
- Project scope
- Preliminary design
- Project management
- Permitting
- Call for tenders
- Execution design
- Budget management
- Contract management
- Works coordination
- Commissioning