Paul Wurth Geprolux is responsible for developing a new HVAC system which will not only reduce energy consumption and CO2 emissions, but will also improve environmental comfort in the offices, conference rooms, and common areas.

A new centralized cooling system proposed by Paul Wurth will at the same time reduce energy consumption and increase maximum output by approximately 50%.

Key figures

Built volume

16.800 m3

Built surface

6.500 m2

Project duration

2008 - 2012

Construction period

2009 - 2012

Our missions

  • Project scope
  • Project preparation
  • Project management
  • Green building design
  • Preliminary design
  • Permitting
  • Contract management
  • Construction site management
  • Works coordination
  • Commissioning
  • Efficiency optimisations