Maintenance hall CFL – Modular building

Building owner

Société des Chemins de Fer Luxembourgeois - CFL

Location

Luxembourg

To enable the construction of the new maintenance several CFL entities should have been delocalized and gathered inside a new office building. This administrative building (BAS) was designed in close cooperation with the final user in order to foresee required functionalities. A high quality modular building has been built within 6 months and the take-over of this building by the CFL brought entire satisfaction to the customer.

Key figures

Built volume

6.800 m3

Built surface

2.000 m2

Project duration

2010-2011

Construction period

6/2011-12/2011

Our missions

  • Project preparation
  • Preliminary design
  • Execution design
  • Authorizations
  • Call for Tenders
  • Budget management
  • Planning management
  • Coordination of construction works
  • Approvals

Design team

Design Team

A.M. Paul Wurth Geprolux / Deutsche Bahn International