4th extension of the Court of Justice of the European Union
Building owner
Administration of Public Buildings – Court of Justice of the European Union
Location
Luxembourg
This overall large scale project was coordinated by Paul Wurth Geprolux and included the construction of five administrative buildings and an under-ground parking of 760 parking spaces. The complexity of the project consisted in the combination of a variety of buildings including two high-rise towers that are 103m high with 26 floors, a 300m long gallery linking the newly constructed buildings with the existing buildings, the « Palais » with 5 court rooms and the building « Anneau » with the judges’ offices.
Key figures
Gross volume
610.000 m3
Built surface
125.000 m2
Project duration
1998-2009
Our missions
- Project preparation
- Project management
- Design coordination
- Permitting
- Budget management
- Contract management
- Construction site management
- Works coordination
- Commissioning
- Financing services
Design team
Architect
Dominique Perrault/Paczowski & Fritsch/M3 Architectes
Civil Engineer
InCa/Schroeder & Associés/TR-Engineering
Technical Engineer
Felgen/Bevilcqua/Jean Schmit Engineering/RMC Consult