The project includes both the upgrade of the workplace security and fire protection infrastructure to contemporary standards, and a major building expansion. The extension has been designed and built in steel structure by Paul Wurth S.A., with architectural features consistent with the existing building.
Key figures
Built volume
22.500 m3
Built surface
6.500 m2
Project duration
2001 - 2005
Construction period
2002 – 2005
Our missions
- Project scope
- Preliminary design
- Pick-up of project
- Project management
- Permitting
- Call for tenders
- Execution design
- Budget management
- Contract management
- Works coordination
- Commissioning
Design team
General planner
Paul Wurth Geprolux, in collaboration with
Architect
Lucien Zbiorczyk
Civil Engineer
Daedalus Engineering
Technical Engineer
Betic