Extension of the fundamental school Noertzange
The township Bettembourg decided to build an adjoining building to the existing school in order to increase the capacity of the structure. Paul Wurth Geprolux proposed a functional educative concept suitable to the end-users needs.
The construction of the modular building consists of 2 classrooms, 1 dressing room and 1 kitchen with furniture. The premises were built in 2 months.
Key figures
Built volume
500 m3
Built surface
140 m2
Project duration
May to Sept. 2014
Construction period
2 months
Our missions
- Project preparation
- Project management
- Engineering
- Authorizations
- Elaboration of tender document
- Budget management
- Construction site management
- Works coordination
- Commissioning