Extension of the school center Bivange / Berchem
The township Roeser decided to build an additional floor to the existing school in order to increase the capacity of the structure. Paul Wurth Geprolux proposed a functional educative concept suitable to the end-users needs.
The construction of the modular building consists of 6 classrooms, 1 media centre, 1 handicrafts room, WCs also for disabled people, a living room and a lift. dressing room and 1 kitchen with furniture. The new floor was built in 2 months. The upgrade of ground level has been managed in parallel by Paul Wurth Geprolux.
Key figures
Built volume
2.800 m3
Built surface
800 m2
Project duration
2014 (∼ 8 months)
Construction period
2 months
Our missions
- Project preparation
- Project management
- Engineering
- Authorizations
- Elaboration of tender document
- Budget management
- Construction site management
- Works coordination
- Commissioning
Design team
General planner
Paul Wurth Geprolux
A new project?