Back to projects
Menu

High School Aline Mayrisch

Building owner

Administration of Public Buildings

Location

Luxembourg

The new building has five floors which include 49 rooms that can hold 24 students each and 4 rooms that will be able to hold 48 students. Additionally, some office space for administrative and janitiorial personnel was foreseen. There are also 4 workshop areas for wood, metal, electronic and electrical engineering. The high school is easily accessible from the boulevard Pierre Dupong and it has 450 covered parking places just located under the schools outside playground.

Key figures

Built volume

117.000 m3

Built surface

25.300 m2

Project duration

1996 - 2000

Our missions

  • Project preparation
  • Project management
  • Design coordination
  • Permitting
  • Budget management
  • Contract management
  • Construction site management
  • Works coordination
  • Commissioning
  • Financing services

Design team

Architect

Tetra-Kayser Associés

Civil Engineer

Best Ingénieurs

Technical Engineer

Jean Schmit Engineering

To discover
also

Confident with complexity.

A new project?

Contact us