Maintenance hall CFL – Modular building
Building owner
Société des Chemins de Fer Luxembourgeois - CFL
Location
Luxembourg
To enable the construction of the new maintenance several CFL entities should have been delocalized and gathered inside a new office building. This administrative building (BAS) was designed in close cooperation with the final user in order to foresee required functionalities. A high quality modular building has been built within 6 months and the take-over of this building by the CFL brought entire satisfaction to the customer.
Key figures
Built volume
6.800 m3
Built surface
2.000 m2
Project duration
2010-2011
Construction period
6/2011-12/2011
Our missions
- Project preparation
- Preliminary design
- Execution design
- Authorizations
- Call for Tenders
- Budget management
- Planning management
- Coordination of construction works
- Approvals
Our services
Design team
Design Team
A.M. Paul Wurth Geprolux / Deutsche Bahn International
To discover
also
A new project?