« Porte de l’Europe » – Tower B
The ambition of the engineering mission is to elaborate a conceptional study in order to reduce the energy consumption for HVAC. The approach consists in expertizing the existing external building structure, to define the weak points. The results of this study are at the origin of our recommendation so as to improve the energy efficiency of the building and to reduce the CO2 emissions.
Key figures
Built volume
55.000 m3
Built space
19.000 m2
Project duration
2009 – 2010
Our missions
- Efficiency optimisations
Our services
Design team
Architect
Ricardo Bofill / Taller de Arquitectura
Conception
Gubbini & Linster Architectes
A new project?