PRIMOREC – PRIMUS Factory

Building owner

Primorec S.A

Location

Differdange

This new dust treatment plant for blast furnace dusts includes several production halls, for all equipment, chimneys and also an administrative building. The project hosts the first industrial building equipped with the environmental friendly “PRIMUS“ technology, being an ecological process of recycling the dust (Paul Wurth patent).

Key figures

Built volume

25.000 m3

Built surface

2.000 m2

Project duration

2000 – 2006

Construction period

2002 – 2005

Our missions

  • Definition of scope
  • Project management
  • Preliminary design
  • Permitting
  • Execution design
  • Budget management
  • Contract management
  • Works coordination
  • Construction works
  • Commissioning

Design team

Design & Build of the industrial plant

Paul Wurth

Project Management for the transformation & renovation of the administrative building

Paul Wurth Geprolux