PRIMOREC – PRIMUS Factory
This new dust treatment plant for blast furnace dusts includes several production halls, for all equipment, chimneys and also an administrative building. The project hosts the first industrial building equipped with the environmental friendly “PRIMUS“ technology, being an ecological process of recycling the dust (Paul Wurth patent).
Key figures
Built volume
25.000 m3
Built surface
2.000 m2
Project duration
2000 – 2006
Construction period
2002 – 2005
Our missions
- Definition of scope
- Project management
- Preliminary design
- Permitting
- Execution design
- Budget management
- Contract management
- Works coordination
- Construction works
- Commissioning
Our services
Design team
Design & Build of the industrial plant
Paul Wurth
Project Management for the transformation & renovation of the administrative building
Paul Wurth Geprolux
A new project?