ArcelorMittal – Office building
The refrigeration machines of the AMOB building worked with R 22 as refrigerant and were no longer allowed to be exploited beyond the year 2009. Thus the refrigeration unit has been completely rebuilt with the installation of 4 new refrigeration compressors with magnetic suspension, running R134a and 2 hybrid cooling towers on the roof.
Key figures
Cooling capacity
1.200 kW
Project duration
2007-2010
Construction time
2008-2009
Our missions
- Feasibility study
- Technical concept
- Permitting
- Preliminary design
- Detail design
- Call for tenders
- Construction management
- Commissioning
- Follow-up post-mortem
Design team
Technical Engineer
Paul Wurth Geprolux