4th extension of the Court of Justice of the European Union

Building owner

Administration of Public Buildings – Court of Justice of the European Union

Location

Luxembourg

This overall large scale project was coordinated by Paul Wurth Geprolux and included the construction of five administrative buildings and an under-ground parking of 760 parking spaces. The complexity of the project consisted in the combination of a variety of buildings including two high-rise towers that are 103m high with 26 floors, a 300m long gallery linking the newly constructed buildings with the existing buildings, the « Palais » with 5 court rooms and the building « Anneau » with the judges’ offices.

Key figures

Gross volume

610.000 m3

Built surface

125.000 m2

Project duration

1998-2009

Our missions

  • Project preparation
  • Project management
  • Design coordination
  • Permitting
  • Budget management
  • Contract management
  • Construction site management
  • Works coordination
  • Commissioning
  • Financing services

Design team

Architect

Dominique Perrault/Paczowski & Fritsch/M3 Architectes

Civil Engineer

InCa/Schroeder & Associés/TR-Engineering

Technical Engineer

Felgen/Bevilcqua/Jean Schmit Engineering/RMC Consult