Back to projects
Menu

Court of justice of the European Union

Building owner

Administration of publics building / Court of Justice of the European Union

Location

Luxembourg

Paul Wurth Geprolux has been entrusted for the management of the guarantees and latent defects for the period beginning after the construction of the 4th extension of the Court. In the frame of this mission the responsibilities of the locator, having their origins in the contract between the Grand Duchy of Luxembourg and the Court, were managed as well. A multitude of latent defects, touching various and severe technical fields as for example water tightness, structures vibrations, disorders due the effects of the weather, were taken into consideration and processed.

Key figures

Project duration

2010 – ongoing

Construction period

2010 – ongoing

Our missions

  • Preparation of the project
  • Clarification of the responsibilities
  • Project management
  • Contract management
  • Coordination of the design
  • Coordination of the expertises
  • Coordination of the works
  • Reporting

Design team

Architect

Dominique Perrault Architecture / APF

Civil Engineer

Schroeder & A. / IncA

Technical Engineer

Felgen & A. / RMC / Jean Schmit Engineer