High School Aline Mayrisch
The new building has five floors which include 49 rooms that can hold 24 students each and 4 rooms that will be able to hold 48 students. Additionally, some office space for administrative and janitiorial personnel was foreseen. There are also 4 workshop areas for wood, metal, electronic and electrical engineering. The high school is easily accessible from the boulevard Pierre Dupong and it has 450 covered parking places just located under the schools outside playground.
Key figures
Built volume
117.000 m3
Built surface
25.300 m2
Project duration
1996 - 2000
Our missions
- Project preparation
- Project management
- Design coordination
- Permitting
- Budget management
- Contract management
- Construction site management
- Works coordination
- Commissioning
- Financing services
Design team
Architect
Tetra-Kayser Associés
Civil Engineer
Best Ingénieurs
Technical Engineer
Jean Schmit Engineering