Liberty / Goethe / Schiller Building
This apparent need for asbestos abatement encompassed several interconnected buildings. The survey of existing conditions was challenging because the buildings were in different demolition stages. Several transitional measures were necessary to ensure the isolation of contaminated areas.
Key figures
Built volume
13.200 m3
Built surface
4.200 m2
Project duration
2003 – 2006
Construction period
2004 – 2006
Our missions
- Project preparation
- Project management
- Design coordination
- Permitting
- Contact with public authorities
- Budget management
- Contract management
- Works coordination
- Commissioning
Our services
Design team
Engineer
Luxcontrol / Eneco