CFL – New railway station: Belval-University
Building owner
CFL, chemins de fer luxembourgeois (National society of the Luxembourg Railways)
Location
Esch-Belval
This new railway station will be one of the main axis of entrance to the Belval site. Besides this, the project represents major technical challenges such as the construction of the elliptical-shaped prefabricated concrete elements on the bottom side, the roof design composed out of EFTE cushions and a permanent train circulation during the works.
Key figures
Built volume
38.000 m3
Built surface
6.500 m2
Project duration
2005 - 2010
Construction period
2007 – 2010
Our missions
- Pick-up of project
- Project management
- Design coordination
- Permitting
- Budget management
- Contract management
- Construction site management
- Works coordination
- Quantity surveyor
- Commissioning
Our services
Design team
Architect
Jim Clemes
Civil Engineer
Milestone Consulting Eng., / Schroeder & Associés
Technical Engineer
Jean Schmit Eng., Betic