ArcelorMittal – Steelmill Rodange
The existing plant processing steel products is equipped with several cranes which can lift and carry very heavy loads. It is within this context that Paul Wurth Geprolux has organized the rebuilding of the tracks (worn over time by the crane movements) and partial columns of the hall (weakened by differential settlements of foundations).
Key figures
Project duration
2007
Construction period
2007
Our missions
- Feasability study
- Preliminary design
- Call for tenders
- Budget management
- Construction management
- Commissioning
Our services
Design team
General planner
Paul Wurth Geprolux in collaboration with Klaus-Dieter Gorges