Blast-Furnaces A and B in BELVAL- WEST
In 2004, Paul Wurth Geprolux has been entrusted with the studies and the necessary work in order to keep the two blast furnaces A and B on the Belval site. The task is important, given the state of degradation in which the two buildings were after their retirement and because the original work had to be preserved to a maximum.
Key figures
Surface treatment paint/varnish
~62.500 / 27.000 m2
Demolition steel/concrete struct
~6.500 to/43.000 m3
New steel/concrete structures
~415 to / 110 m3
Project duration
2004 – 2013
Construction period
2006 – 2013
Our missions
- Project scope
- Preliminary design
- Permitting
- Detail design
- Call for tenders
- Safety requirements
- Works coordination
- Commissioning
Our services
Design team
General planner
Paul Wurth Geprolux
A new project?