Blast-Furnaces A and B in BELVAL- WEST

Building owner

Fonds de Belval

Location

Esch-Belval

In 2004, Paul Wurth Geprolux has been entrusted with the studies and the necessary work in order to keep the two blast furnaces A and B on the Belval site. The task is important, given the state of degradation in which the two buildings were after their retirement and because the original work had to be preserved to a maximum.

Key figures

Surface treatment paint/varnish

~62.500 / 27.000 m2

Demolition steel/concrete struct

~6.500 to/43.000 m3

New steel/concrete structures

~415 to / 110 m3

Project duration

2004 – 2013

Construction period

2006 – 2013

Our missions

  • Project scope
  • Preliminary design
  • Permitting
  • Detail design
  • Call for tenders
  • Safety requirements
  • Works coordination
  • Commissioning

Design team

General planner

Paul Wurth Geprolux