The mission is to create a new hall for the maintenance of rolling stock for the CFL and to build an administrative building. The hall, specific railway maintenance equipment and outfitting of the surroundings have to be studied in accordance with very ambitious deadlines and budgetary target. The same for the technical challenges to achieve an effective and efficient working tool for the CFL.

Key figures

Built volume

240.000 m3

Built surface

23.000 m2

Project duration

2010 - 2015

Construction period

2011 – 2014

Our missions

  • Project preparation
  • Feasability study
  • Preliminary design
  • Permitting
  • Detail design
  • Call for tenders
  • Budget management
  • Contract management
  • Schedule management
  • Works coordination
  • Commissioning