EUROPEAN COURT OF AUDITORS – Extension 1
This administrative building of the European Community includes offices, archives and meeting rooms, parking areas, cafeteria, fitness center, a multimedia conference room with 165 places and 22 interpretation cubicles. The building is one of the first to be equipped with innovative tempered concrete slabs, whereby the concrete structure itself serves as a thermal buffer for heat and cold.
Key figures
Built volume
83.000 m3
Built surface
21.500 m2
Project duration
1999 – 2004
Construction period
2001 – 2004
Our missions
- Project preparation
- Project management
- Execution design
- Call for tenders
- Permitting
- Budget management
- Contract management
- Construction site management
- Works coordination
- Commissioning
Design team
Architect
Jim Clemes
Civil Engineer
Schroeder & Ass.
Technical Engineer
Emch & Berger
Execution
Paul Wurth Geprolux in collaboration with GMT Concept (Architecture)