The refurbishment works of the high school, stretching over 2 phases, began in summer 2012 and were planed to last 4 years.

This 1st phase, foreseen until end of 2015, consists in the refurbishment of the premises built in the 50’s. It included also the construction of an underground parking of 60 spaces, an office building and a new multi-sports hall.

The 2nd phase (end-2015 to end-2017) will concentrate on the refurbishment and upgrade of the building being around the 70’s.

The goal of this project is to adapt the existing buildings to the developed needs of the end-users while bringing functional solutions.

Key figures

Built volume

70.000 m3

Built surface

21.500 m2

Project duration

2011 - 2018

Construction period

2013 – 2017

Our missions

  • Check of the tender documents
  • Check of the execution documents
  • Assistance to site meetings
  • Follow-up of the works
  • Follow-up of the planning
  • Assistance to acceptances
  • Check of the bill of quantities
  • Technical and administrative control

Design team

Architect

Ballini Pitt

Civil Engineer

Lux CEC

Technical Engineer

EnerventisLux