Fondation Félix Chomé
After having set the energy audit and developed several scenarii for the refurbishment of the existing building, Paul Wurth Geprolux has been entrusted to concretise the final solution. In the frame of this project, the foundation Félix Chomé mandated Paul Wurth Geprolux for the mission of design team as well as for project manager.
Key figures
Built surface
5.400 m2
Built volume
19.700 m3
Project duration
12 months
Construction period
8 months
Our missions
- Authorizations
- Energy efficiency study and thermal simulations
- Integrated design team
- Tendering process organization
- Construction site management
Our services
Design team
Architect
2001 Architectures
Civil Engineer
Daedalus Engineering