MOOG / HYDROLUX – Industrial hall
This new industrial complex in Bettembourg includes the production of an assembly workshop and administrative offices. During the design stage, particular attention was drawn towards the costs of the project, including the optimization of the heating, ventilation and cooling system.
Key figures
Built volume
45.100 m3
Built surface
5.600 m2
Project duration
2003 – 2006
Construction period
2004 – 2006
Our missions
- Project scope
- Project preparation
- Project management
- Preliminary design
- Permitting
- Execution design
- Call for tenders
- Budget management
- Contract management
- Construction site management
- Works coordination
- Commissioning
Design team
General planner
Paul Wurth Geprolux