Qatar Integrated Railway Project
The Qatar Integrated Railways Project consists of the design and construction of four metro lines, a high speed long distance passenger and a long distance height network meeting the cultural, physical, legal and environmental conditions in Qatar. Along with the lattes goes the set-up of a railway operating entity in Qatar which will be operational for the FIFA world cup 2022.
Key figures
Metro network
~ 360 km
Long distance network
~ 380 km
Project duration
2009 - 2013
Our missions
- Feasibility studies stations
- Feasability studies workshops
- Project Execution Plan
- Document Management Plan
- Quality Management Plan
- Project Management Plan
- Codification Plan
- Change Order Management Plan
- Communication Management
Our services
Design team
Design team
DB-International
To discover
also
A new project?