Swimming Pool « Geesseknaeppchen »
All scholars of the «Campus Geesse-knaeppchen» will benefit from this newly built modern sports center.
The project proved to be one of our many technically challenged projects that enforced using energy saving equipment. For example, the olympic size swimming pool installed inside was equipped with the first solar thermal collector of its size
(approx.1.500 m2) in Luxembourg, for reheating the water of the swimming pool.
Key figures
Built volume
135.900 m3
Built surface
18.150 m2
Project duration
1996-2002
Construction period
1998-2000
Our missions
- Projet preparation
- Project management
- Design coordination
- Permitting
- Budget management
- Contract management
- Construction site
- Management
- Works coordination
- Commissioning
- Facility management
- Financing services
Our services
Design team
Architect
Dieschbourg-Krier
Civil Engineer
Schroeder & Associés
Technical Engineer
Bevilacqua & Associés