Triologie – Multifunctional Building
The new functional building will bring together administrative and commercial areas as well as premises for businesses. The 2 underground floors will bring together parking, storage and technical premises. The mezzanine level and ground level will be dedicated to businesses and while the 2 floors will concentrate on the office space.
Paul Wurth Geprolux is working on the project as an engineer for technical installations (HVAC, Sanitary, Sprinklers and Smoke, Medium and Low Voltage, High Current, Low Current, Lifts, Regulation).
Key figures
Gross volume
~80.000 m3
Gross surface
19.977 m2
Project duration
2015 - 2018
Our missions
- Technical Engineering Engineer for technical installations
- Preliminary studies
- Authorisations
- Project execution
- Submissions and award of contracts
- Realisation of works and receptions
Our services
Design team
Architect
Beiler+François Architectes
Civil Engineer
Daedalus Engineering
Technical installations
Paul Wurth Geprolux
Envelope
Lux-ibea
A new project?