Back to projects
Menu

Windpark Roullingen Goesdorf

Building owner

Société Electrique de l’Our (SEO)

Location

Wiltz

The windpark (WP) in the north of Luxembourg will bring a more significative input in electrical power thanks several new wind turbines (WT).

SEO entrusted Paul Wurth Geprolux to monitor the construction of the infrastructures during erection phase for the following Enercon facilites:

  • WP Rulljen-Géisdref: 4 WT of 3 MW / height max (Hm): 199 m / Propeller diam. (PD): 115 m
  • WP Housen Pétschent: 4 WT of 3 MW / Hm: 199 m / PD: 115 M – 2 WT of 2,35 MW / Hm: 199 m / PD: 92 m
  • WP Hengischt 5: 3 WT of ~3 MW
  • Repowering WP Hengischt 6: 2 WT of 3/2,35 MW

Key figures

Built volume / surface

-

Quantity

15 new wind turbines

Max. power / unit

2,35-3 MW per unit

Max. power in total

~ 40 MW

Project duration

11/2015 – 03/2017

Our missions

  • Coordination of the engineering and works
  • Control of the progression of the construction regarding the planning
  • Participation to site visits / Reporting
  • Quantity survey
  • Control of the invoices

To discover
also

Confident with complexity.

A new project?

Contact us