Paul Wurth S.A. former headquarters
The following technologies: BIM, 3D scanning and building modeling were chosen in this general project of technical and architectural rehabilitation. The goal: to obtain a high quality in studies and works.
These technologies will streamline the integration of this project in the future Hollerich district and also provide a link to a software solution for monitoring the maintenance of this building.
Key figures
Gross volume
11 200 m3
Gross surface
1 350 m2
Project duration
2017- en cours
Our missions
- Preliminary studies
- Project preparation
- Summary of preliminary studies
- 3D scanning inside and outside
- REVIT modeling of the existing LOD300
- REVIT modeling of A.P.S. LOD300
- Studies and integrations of 3D techniques (in progress)
- Cost estimation
Our services
Design team
General planification
Paul Wurth Geprolux
Technical planification
Paul Wurth Geprolux in collaboration with GlobeZenit
To discover
also
A new project?