ArcelorMittal – Disposal site Dommeldange
This complex and exceptional project in Luxembourg aims to secure the toxins contained in the terms placed on the specific discharge. Terms are contaminated with vanadium and molybdenum issued from the production of special alloys of the former factory “Casa”. Specific studies have shown that these can be dull “secure” by making a special seal on compaction and the installation of bassoon retention for runoff.
Key figures
Project duration
2000 – 2007
Construction period
2005 – 2007
Our missions
- Project preparation
- Project management
- Design coordination
- Permitting
- Budget management
- Contract management
- Construction site management
- Works coordination
Our services
Design team
Engineer
Asmus & Prabucki