ECOSTART 3
In order to foster the economical and innovative potential of start-up enterprises the Ministry of the Economy ordered the construction of a two story industrial hall in Foetz-Mondercange.
The production hall can be divided into different sizes, depending on the need of the developing companies. Next to the workshops a three story office building houses new enterprises whose production capacities are still to be developed.
Key figures
Volume
~30.400 m3
Surface
~4.800 m2
Project duration
2010 – 2014
Construction period
2013 – 2014
Our missions
- Feasibility studies
- Preliminary and detailed design
- Budget estimation
- Permits
- Elaboration of tender document
- Budget management
- Scheduling
- Construction site management
- Works coordination
- Commissioning
- Acceptance
Design team
General design
Paul Wurth Geprolux/GMT concept
Civil engineering
GK Engineering
Technical Engineering
Enerventislux
A new project?