CERATIZIT Luxembourg
As part of the project “Relocation and redevelopment of the manufacture Rectification/Wear hall”, the client CERATIZIT initialized a major redevelopment of its production tools, based on a model of organization in production cells.
The goal was to optimize the layout of the 75 machines by regrouping them in families, and to optimize the make-to-stock process flows. The client was looking for an expert capable of assuming the tasks of technical consultancy, project management, and basic engineering.
Key figures
Gross volume
12.500 m3
Gross surface
1.750 m2
Project duration
06.17-05.18 / 12 months
Our missions
- Preliminary / basic engineering
- Project preparation: phasing, detail schedule, impact study, budget evaluation and identification of construction companies
- Indoor 3D scanning of a production hall
- 3D design of the surfaces of the hall, the machines, the piping under the roof and power tracks
- Establishment of technical drawings including the layout of the machines
- Calculation of electrical power
- Coordination & supervision of the works / Monitoring of the costs and timeline
- Integration of lifting solutions (2 bridge cranes)
Our services
Design team
General planner
Paul Wurth Geprolux
Technical planner
Paul Wurth Geprolux
To discover
also
A new project?