DB – Maintenance centre Köln-Deutz

Building owner

DB – Deutsche Bahn AG

Location

Germany

The mission of Paul Wurth Geprolux consists of the execution of technical engineering for a new maintenance hall equipped with 3 rail tracks and 5 work stations for regional trains (with Diesel/gasoil-engines) and its connection to the ancient hall located aside.

The halls and the office building have to be designed within very ambitious planning and budget goals.

Key figures

Built surface

5.750 m2

Quantity work stations

5 stations over 3 tracks

Project duration

2011 - 2014

Construction period

2012 – 2014

Our missions

  • Technical Engineering for services phases 1 -7 & 9 (acc. to HOAI 2009):
  • Project preparation / Preliminary studies
  • Concept / Basic Engineering
  • Engineering phase Authorizations
  • Detailed / Execution Engineering
  • Preparation of Tender documents
  • Contribution to the adjudications
  • Technical assistance
  • As subcontractor for the systems 1- Sanitary, 2- Heating, 3- Ventilation, 4- Heavy current , 5- Telecommunications
  • Technical planning & layout of fire detection & exhaust gases systems – approval
  • Cost estimation allocated to the technical facilities of the building

Our services

Design team

Architect

Deutsche Bahn International

Technical Engineer

DBI / Paul Wurth Geprolux