DB – Maintenance centre Köln-Deutz
The mission of Paul Wurth Geprolux consists of the execution of technical engineering for a new maintenance hall equipped with 3 rail tracks and 5 work stations for regional trains (with Diesel/gasoil-engines) and its connection to the ancient hall located aside.
The halls and the office building have to be designed within very ambitious planning and budget goals.
Key figures
Built surface
5.750 m2
Quantity work stations
5 stations over 3 tracks
Project duration
2011 - 2014
Construction period
2012 – 2014
Our missions
- Technical Engineering for services phases 1 -7 & 9 (acc. to HOAI 2009):
- Project preparation / Preliminary studies
- Concept / Basic Engineering
- Engineering phase Authorizations
- Detailed / Execution Engineering
- Preparation of Tender documents
- Contribution to the adjudications
- Technical assistance
- As subcontractor for the systems 1- Sanitary, 2- Heating, 3- Ventilation, 4- Heavy current , 5- Telecommunications
- Technical planning & layout of fire detection & exhaust gases systems – approval
- Cost estimation allocated to the technical facilities of the building
Our services
Design team
Architect
Deutsche Bahn International
Technical Engineer
DBI / Paul Wurth Geprolux
A new project?