CFL – Funicular Railway Station Pfaffenthal-Kirchberg
Building owner
Société des Chemins de Fer Luxembourgeois - CFL
Location
Luxembourg
This important change pole will link the railway line coming from the North of Luxembourg to the plateau Kirchberg and to the future stop of the tram. The connected bus stop, located in street St. Mathieu in Luxembourg Pfaffenthal enables the transit passengers to have a link to city public transport. The railway stop has a capacity of 5.000 people / day and per each direction (Luxembourg or Troisvierges).
The funicular railway (double railway routing composed of 4 wagons) has a transport capacity of 1.200 people / 10 minutes (transport duration 63 seconds), the largest in the world at the time of commissioning.
Key figures
Project duration
2013 - 2017
Our missions
- Asistant to the Building Owner
- General Project Management of the project
- Follow-up of the design phase
- Authorizations / Permissions
- Budgets management
- Financial management
- Risk management
- Organisation and supervision of the construction site
- Quantity control
Our services
Design team
Architect
Architectes Paczowski & Fritsch
Civil Engineer
Schroeder & Associés / Schönholzer AG / Internes CFL
Technical Engineer
Felgen & Associés / Bureau Hili Manz / Internes CFL