This new railway station will be one of the main axis of entrance to the Belval site. Besides this, the project represents major technical challenges such as the construction of the elliptical-shaped prefabricated concrete elements on the bottom side, the roof design composed out of EFTE cushions and a permanent train circulation during the works.

Key figures

Built volume

38.000 m3

Built surface

6.500 m2

Project duration

2005 - 2010

Construction period

2007 – 2010

Our missions

  • Pick-up of project
  • Project management
  • Design coordination
  • Permitting
  • Budget management
  • Contract management
  • Construction site management
  • Works coordination
  • Quantity surveyor
  • Commissioning

Design team

Architect

Jim Clemes

Civil Engineer

Milestone Consulting Eng., / Schroeder & Associés

Technical Engineer

Jean Schmit Eng., Betic