« NEIE LYCÉE » Modular School Building

Building owner

Ministry of Education / Ministry of Finance

Location

Luxembourg

With the « Neie Lycée » modular school, Luxembourgish State wanted to set up an innovative educational concept. They asked Paul Wurth Geprolux to give them a proposal for a temporary school building to house 300 high school students. The construction of a modular, easily dismountable building, was accomplished within a 3-month period.

Key figures

Built volume

15.000 m³

Built surface

4.600 m2

Project duration

2005

Construction period

3 months

Our missions

  • Project scope
  • Project management
  • Design coordination
  • Permitting
  • Execution design
  • Budget management
  • Construction site management
  • Quality management
  • Commissioning
  • Financing services
  • Facility management