RED CROSS – Rehabilitation Center Refurbishment

Building owner

Foundation Emile Mayrisch / Red Cross Luxembourg

Location

Colpach

The refurbishment and expansion of the 100-bed rehabilitation center was requiring a considerable logistical coordination and a high level of hygienic cleanliness. Paul Wurth was required to provide a temporary facility during the project because the Red Cross Center in Colpach was held operational during the works.

Key figures

Built volume

46.500 m3

Built surface

11.000 m2

Project duration

2004 - 2009

Construction period

2005 – 2009

Our missions

  • Technical assistance to building owner
  • Technical audit
  • Cost management
  • Schedule management
  • Coordination of asbestos removal
  • Site management

Design team

Architect

Jim Clemes

Civil Engineer

TR-Engineering

Technical Engineer

Jean Schmit Engineering